The input control of the Electronic Component Base is carried out in order to prevent the transfer of the Electronic Component Base to the customer that does not meet the established requirements (regulatory and technical documentation, contract, etc.).

During the Electronic Component Base incoming inspection, the following operations are carried out:

The ECB entrance control is carried out in accordance with the Program and Test Methodology, which is developed, agreed and approved in the prescribed manner by the specialists of LTD RADIOAUTOMATIC or provided by the customer. It shows the percentage of ECB allowed for the lot. The results of the input control of the ECB are recorded in the reporting documentation (in the protocols and conclusion).

Thus, the input control provides: